The fully automatic detergent powder production line with an annual output of 50,000 tons in Angola, which was built by Meibao, was put into operation recently. Over the past year and more, the two parties have worked actively to overcome various unfavorable factors, especially the major risks posed by COVID-19, strengthened epidemic prevention and promoted the progress of the project. We would like to express our heartfelt thanks to the builders who have worked hard in the construction of the project!
发布时间:
2021
-
05
-
17
浏览次数:10
Meibao recently won the bid for the construction of the upgrading and transformation project of the detergent powder production line of Anhui Anqing Nafine Daily Chemical Co., Ltd.. After the completion of the project, the annual production capacity will reach 120,000 tons, and it will fully meet P&G's formula requirements.Anhui Anqing Nafine Daily Chemical Co., Ltd. is a wholly-owned subsidiary of Nafine Chemical Group. Nafine Chemical Group is currently China’s largest production base for detergents, inorganic salts and potash fertilizers. It has ne...
发布时间:
2021
-
04
-
30
浏览次数:6
The upgrading and reconstruction of detergent powder project of Liaoning Lonkey Industrial Co., Ltd. with an annual output of 100,000 tons was successfully put into production recently. This project is an OEM factory of P&G. After more than half a year of construction, it met the production requirements of P&G and Lonkey, and put it into normal production and operation.
发布时间:
2021
-
04
-
27
浏览次数:15
The waste gas incineration heating system of rock wool production line constructed by Meibao has been commissioned and delivered to operation recently. The waste gas of the cupola is fully incinerated and utilized, and the energy-saving effect is obvious.
发布时间:
2021
-
04
-
26
浏览次数:11
Meibao won the bid for the turnkey project of the detergent production line of Nice, and the construction in Angola began a few days ago. The two parties actively cooperate, carefully organize and arrange to do a good job in epidemic prevention, and jointly promote project construction.
发布时间:
2021
-
04
-
16
浏览次数:14
Meibao recently won the bid for a foreign turnkey project of detergent powder and liquid detergent production line with annual output of 100,000 tons, and signed the EPC turnkey contract. Meibao has carried out planning, design and equipment manufacturing according to the contract content.
发布时间:
2021
-
04
-
15
浏览次数:17
The heating system for waste gas incineration of 1# rock wool production line of Shanxi Juxin Energy Saving Technology Co., Ltd. undertaken by Meibao has been reformed and delivered to normal production, saving about 6000 yuan of natural gas consumption per day. In 2020, Shanxi Juxin Company completed the construction of heating system for waste gas incineration of 2# rock wool production line. After achieving significant energy saving effect, it timely carried out technical upgrading and transformation on Line 1. It has played a positive role in energy saving and...
发布时间:
2021
-
03
-
30
浏览次数:16
Meibao has passed the Quality Management System Certification and Environmental Management System.
发布时间:
2021
-
03
-
23
浏览次数:19
Around the Spring Festival, Meibao received a number of rock wool production enterprises, customers had an in-depth understanding of the 'energy-saving rock wool waste gas incinerator' developed by Meibao and signed contracts.The rock wool waste gas incinerator developed by Meibao makes full use of the low calorific value waste gas generated by the cupola, and burns it completely. The heat generated by the combustion provides for the cupola and curing oven. This is turning waste into treasure, it greatly reduces the fuel consumption, making the consumption of natural gas produced by ro...
发布时间:
2021
-
03
-
08
浏览次数:21